Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Information Required for Usage of Professional Camera Equipment held in MCASI Store

For undergraduates’ courses, camera selection is pre-allocated to the various units and is approved through the Project Approval process with their supervising tutor.

Undergraduates wanting to access a camera outside of their unit allocation MUST seek approval from their supervising academic and are to discuss details during the Project Approval process such as;

  • The reasoning for selecting the camera chosen for the project, including both creative and technical aspects

  • Shooting environment (interior, exterior, etc.)

  • Any other relevant details


Sony PXW-FS7

Sony PMW-F5

Sony PMW-400

Sony PMW-300

Camera Availability

3rd Year Students

3rd Year Students

2nd & 3rd Year Students

2nd & 3rd Year Students

Camera Format

Mid-Range Cinema/Doco

Cinema/High End Doco

ENG/Doco

ENG/Low End Doco

Max Resolution

3840x2160 (4K)

2048x1080 (2K)

1920x1080 (1080p)

1920x1080 (1080p)

MAX FPS

180FPS @ 1080P 60FPS @ 4K

240FPS @ 1080P

50FPS @ 720P

50FPS @ 720P

ND Filter

 Yes: Clear – 6 Stops

Yes: Clear – 6 Stops

Yes: Clear – 6 Stops

Yes: Clear – 6 Stops

Lens Mount

Sony A or EF

PL

B4

2/3 Inch Bayonet Mount

Sensor

 Super 35mm

Super 35mm

3x 2/3” Sensor

3x 1/3” Sensor

Dynamic Range

 14 Stops

14 Stops

~12 Stops

~11.5 Stops

Codec

HD422 10 Bit

HD444 10 Bit (16 in raw)

HD422 10 Bit

HD422 10 Bit

Number of Cameras

1

2

5

15

Approval Process

Supervising Academic

Supervising Academic

Supervising Academic

Supervising Academic

Projects requiring Head of School Approval

Requests for equipment project usage to be approved by the School Business Manager (delegated from Head of School):

  1. Any overseas/international usage by staff or students

  2. Any requests by Curtin staff from other Schools (not MCASI)

  3. Any requests for usage at Curtin events

  4. Any other requests for usage not mentioned above

In the first instance, all requests must be directed through the Manager, Creative Production Support Unit.

  • No labels