Skip to end of metadata
Go to start of metadata
You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
« Previous
Version 7
Next »
Location Equipment and Recording |
EQUIPMENT LIST |
Camera: | Google Pixel 7a |
Recording Medium: | Internal |
Tripod: | Miller DS-10 with quick release plate in fabric carry bag |
Sound: | Sennheiser ME66 Microphone with Shock Mount and WindsockXLR CablesHeadphonesBoom Pole |
Lights: | Aputure LS60X Lighting KitsCineroidsAputure C120 LightsAputure Light modifiers |
Accessories: | Portable Chroma Key ScreenSpider DollyLighting Gels and ScrimsReflectorsPower cables and power distribution boardsSafety equipment – sandbags, reflective vests. |
Accessories Requiring Academic Approval: | GoProWally Dolly Track Kit
|
|
Sony PXW-Z150 Professional Camcorder |
1080 - 25P FH |
Check these settings when collecting camera equipment from the MCASI Store, and if they are different, please ask one of the technical staff or the MCASI Store for assistance in re-setting them to the above parameters. |
Editing and Post- Production |
Students enrolled in SPRO2001 Introduction to Screen Practice as part of a Screen Arts major or minor will use MAC base Adobe Premiere Pro for editing and post-production. |
Each step in the process is detailed in the Adobe Premiere Pro Section. |
Will be based on the clips from the Sony PXW-Z150 Professional Handheld Camcorder |
Timebase | 25fps |
Frame Size: | 1920x1080 (16:9) |
Pixel Aspect Ratio | Square Pixels (1.0) |
|
|
ADOBE PREMIERE PRO ASSESSMENT EXPORT SETTINGS |
VIDEO |
| QuickTime |
Video Codec: | H.264 |
Quality: | 100 |
Width: | 1920 |
Height: | 1080 |
Frame Rate: | 25 |
Field Order: | Progressive |
Aspect: | Square Pixels (1.0) |
AUDIO |
Audio Codec: | Uncompressed |
Sample Rate: | 48kHz |
Channels: | Stereo |
Sample Size: | 16-bit |
Audio Track Layout: | Single Track |
Equipment Availability |
EQUIPMENT AVAILABILITY |
All equipment associated with SPRO2001 | Maximum two day consecutive booking or over weekend loanBooking MUST be made at least 24hours before collectionAccess to equipment is always at the Supervising Tutor’s discretionAny group returning equipment later then the nominated ‘return time’, risks the action being deemed as an unauthorised extension.
|
Academic Approval | To gain access to equipment students MUST present the appropriate Project Approval signed by their tutor and/or Unit Coordinator along with the relevant Risk Assessment documentation. |
-
Page:
-
Page:
-
Page:
-
Page:
-
Page:
-
Page:
-
Page:
-
Page:
-
Page:
-
Page:
-
Page:
-
Page:
-
Page:
-
Page:
-
Page:
Add Comment